Today's big advance: Ella's bed is taking shape.
Here, the chief architect scribbles some notes for the carpenter:
Elsewhere, the plasterers have finished the master bedroom...
Here's the master looking toward the en-suite...
...and the door to the lounge.
They've also plastered down the lower stairs...
...down to the side of the music room by the front door. Excluding the bathrooms, the plastering is now complete on the top two floors.
Meanwhile down on the ground floor, the other gang have cemented over most of the pipework.
They have, however, left a couple of holes for the brick piers at either side of the steel RSJ above the bifolding doors:


No comments:
Post a Comment