Thursday, 7 November 2013

Thu 7 Nov

As the electrics aren't yet fully fixed, when we open the door of an evening there's a moment of reaching for the torch and wondering what's gone on. Quite fun, then, to find this right by the front door:


Yep, the cement mixer's been rolled into action at the back of the house - presumably for something rather technical to do with the foundations, considering they've been pouring inside and outside the back doors.



The holes in the floor have got a bit bigger too, but presumably these will soon have pipes in and be concreted up...


...especially considering that new waste-water pipes are coming up from the drains. This one's for the main stack running up to the first-floor en-suite and top-floor bathroom.


And here's one for the kitchen sink.


Up on the first floor, they've finally added the partition between the master and en-suite. They're starting the bathroom fittings next week.